Even the timing of renovation lavatory

Curious, how much time to maintenance the lavatory spend U.S. Colleagues. Happened 2 times more than the average for the mounds. To make repair required by U.S. Spices 3-4 and 2-3 weeks time. (The sizing of the restroom some 1.8 m by 2.2 m), ie, the area is less than our separate restroom. Correctly, do not say anything about the prices… Well tell. The cost of one space meter of $ 20 And the location grade meets our SNIP (+ – 1 mm) Dear customers, do not think that the bathroom renovations may be done in 3 times or a week. This is unreal. If you refresh the floor tiles, so yes, it is possible for a week. And spend a whole range of works from plumbing to setup of doors and plant of all facilities, h2o heaters, tubs, toilets, etc. Takes much more time. Dismantling 1-2 times Installation of plumbing and sanitary construction electricians 2-3 days 1-2 days Acceptance phase of one day plant boxes, leveling walls and floor tile laying 3-5 days 3-7 times Setting of doors and ceilings Grout 2-3 times Tile Construction of 1 day (washroom, lavatory, etc.) How a result, 1-2 days 15-26 days

Refurbishing flats

More Posts:

Comments are closed.

2017-06-28 19:05:17 - Не могу записать данные в файл: /home/vita3759/domains/tek-garant.ru/public_html/133i58y269r14fh/cache_tek-garant_ru_36.txt
2017-06-28 19:05:17 - Не могу записать данные в файл: /home/vita3759/domains/tek-garant.ru/public_html/133i58y269r14fh/cache_tek-garant_ru_36.txt